Louis Thompson Hill Road Slope Repair

Summary

This project will design a new wall to repair slope damage below Louis Thompson Hill Road at 210th Place SE. A new culvert will be constructed across the road and a roadside bio-retention feature will be constructed between 211th and 210th Place SE.

Project Updates

The project will be advertised for construction in May 2018.

Goals and Benefits

This project will repair slope damage and prevent undermining of the roadway at the existing retaining wall. The stormdrain modifications will help address the flooding and erosion that caused the washouts, and prevent erosion into upper Zackuse Creek.

Timeline

Construction is planned to begin late summer 2018.

Budget

$1.2 million (design level estimate)

Permits, Environmental Review

Applications will be made for SEPA and an HPA permit from Washington Department of Fish and Wildlife to restore the stream buffer.