East Lake Sammamish Shore Lane Reconstruction
Project Summary
The City of Sammamish is soliciting interest and qualifications from firms with expertise in Civil and Environmental Engineering, Land Surveying, Planning, Design, and Construction to perform preliminary engineering and prepare final project plans, specifications, and cost estimates for our East Lake Sammamish Shore Lane Project project.
This project is to reconstruct approximately a 900’ section of East Lake Sammamish Shore Lane SE (Shore Lane) from SE 33rd St to the gate entering the property of 3611 East Lake Sammamish Shore Lane SE. Shore Lane is a residential street west of East Lake Sammamish Parkway that services 14 homes. The exact location is outlined in the ‘Vicinity Map’, Attachment B. The street exists in CITY right-of-way between residential properties on the west and King County right-of-way for the trail on the east. The road is not built to current CITY standards and is approximately only 18’ wide with very thin layers of HMA and base courses.
Shore Lane currently is the lowest-rated street by PCI in Sammamish. The entire street contains heavy alligator cracking and the southern 450’ has significant settlement issues. Geotechnical inspection found the southern portion of the road is built on top of layers of organic material including peat and sawdust dating back to when the area was used as a sawmill. The depths of organic layers are unverified but may be multiple feet deep from preliminary street coring done in early 2021. The initial recommendation of the geotechnical engineer was to rebuild the roadway cross section for the southern half of the street above a layer of lightweight fill material. The base material on the northern half is of less concern and only a new pavement layer was recommended during the same exploration.
This project concept is straightforward, but there are known complexities that the CONSULT will need to work through. The following is not to be considered a full list of complexities but highlights the currently known challenges.
- Running costs analysis on lightweight fill vs. excavating out organic materials.
- Permitting requirements since the work is in close proximity to Lake Sammamish.
- Unrecorded stormwater systems and likely need to expand/improve the existing system.
- Reestablishing the flowline of the road to remove ponding/puddling.
- Private well waterline for the street that is shallow and needs to be upgraded. Consultant will either need to work with residents’ designer for the upgrade or will need to design the upgrade as part of this project depending on the residents’ preferred approach.
- Tying into existing driveway elevations and/or working on driveway approaches.
- Construction staging to allow for residents to continue to have access to their property.
- Tight ROW between existing residential properties on the west and King County property on the east.
- Per geotechnical engineer, work will need to occur in the late summer months because of the existing soil conditions.
The final product of this contract will be for the CITY to have a useable, construction-ready plan set, specification package, and engineer’s estimate for the reconstruction of East Lake Sammamish Shore Lane SE in time to be construction ready in July 2023.
Proposed Timeline
Schedule of Events |
Date (Subject to Change) |
Notes |
Formal solicitation |
Dec. 16, 21 & 28, 2021 |
Advertised in the Seattle Times and Daily Journal of Commerce |
Deadline for questions |
Jan 5, 2022 |
Submit questions in .pdf form to City Project Manager by e-mail only. Questions will be answered as soon as possible. |
City final response to questions |
Jan. 6, 2022 |
Questions and responses will be posted on the project website listed below under Questions & Clarifications |
Proposals due |
Jan. 13, 2022 |
Proposals must be delivered or mailed and received prior to posted date/time. |
Consultant Selected |
Jan. 21, 2022 |
UPDATED 1/21/22 - Additional review time is needed to staff. Notice of selection will be during the week of 1/24. Thank you for understanding.
Additional review time may be needed. Please follow webpage schedule for updates. If necessary, interviews will take place on Feb. 8, 2022. |
Complete contract negotiations |
Feb. 8, 2022 |
|
Contract Awarded by City Council |
Mar. 1, 2022 |
Will be extended to next available Council Meeting if additional negotiation time is needed. |
Anticipated project start |
Mar. 7, 2022 |
Original Request for Qualifications
REQUEST FOR QUALIFICATIONS - EAST LAKE SAMMAMISH SHORE LANE
ADVERTISEMENT - EAST LAKE SAMMAMISH SHORE LANE Advertised in the Seattle Times and Daily Journal of Commerce on December 16, 21 & 28, 2021.
Questions / Clarifications / Addenda
QUESTION AND CLARIFICATIONS #1 - POSTED 12/22/2021
QUESTION AND CLARIFICATIONS #2 - POSTED 12/29/2021
Contact Information
DELIVER OR MAIL RFQ SUBMITTALS TO:
City of Sammamish
801 228th Avenue SE
Sammamish, WA 98075
Complete submittals are required to be delivered by the date and time (Pacific Standard) listed above in the Proposed Timeline section. Emailed or faxed submittals will not be considered.