2015 Pavement Repair
Introduction
This project is for localized pavement repairs on various City of Sammamish streets.
Goals
The project involves the removal of HMA, patching of pavement, placement of rock retaining walls and quarry spalls behind the guardrails, resetting and removal of guardrails, installation of trench under-drains with and without pipes, geotextile installation for reinforced slope and underground drainage, and marking for the pavement.
Process
The sites on East Lake Sammamish Parkway are under construction. The rockery walls are getting installed behind the guardrail.
Site 1 and Site 2 were completed